It's amazing how many CE properties that are targeted for this pipeline.
I guess they assume or figure fewer properties is the path of least resistance.
\"I never saw a wild thing feel sorry for itself. A small bird will drop dead frozen from a bough without ever having felt sorry for itself.\" <br />D.H. LAWRENCE
Currently there are 32 active data center projects in South Carolina totaling $16B of investment. The largest being the DC Blox proejct Daybreak in Charleston coming in at close to $4B. Followed by Google in Ridgeville close to 1.6B and QTS Cobra project in Rockhill has about 15 smaller ones planned. Terra Nexus in Camden followed by some other smalls. This stuff for Colleton hasn't hit the "data" sources yet.
In Hampton Co., the proposed gasline will traverse 11 landholdings that are protected by perpetual conservation easements if they stay the course!
That is absurd to say the least and landowners have a right to be pissed just like Mr Allen Bell and other Colleton Co landowners that will be directly impacted by the proposed data center.
If they are a must, there are better options that would be far less destructive than each respective location of these new utility infrastructures.
ETA, Weyerhauser and other industry landowners are looking for HBU options for all this land right now and they don't give a shit about the environment, rural landscapes and neighborhoods, or you and I....HBU=Max return
Last edited by Calibogue; 12-18-2025 at 08:14 AM.
\"I never saw a wild thing feel sorry for itself. A small bird will drop dead frozen from a bough without ever having felt sorry for itself.\" <br />D.H. LAWRENCE
saw where the meeting got heated.
"I am a man, not an animal and I always try to conduct myself accordingly. Doing anything less is just giving up and expecting (and being okay) with failure."
Rubberhead
Mullins.....has found God?
\"I never saw a wild thing feel sorry for itself. A small bird will drop dead frozen from a bough without ever having felt sorry for itself.\" <br />D.H. LAWRENCE
Was interested in this story until " Southern Environmental Law Center". Fuck those communists...
https://www.thestate.com/news/local/...314263929.html
Our power bills are headed to $500 a month, we already having to buy power from other states.
My power bill was $455 last month …. Now that my wife put up her Clark Griswold decorations I should get back down to $200 a month.
This just in....
LightHouse Data Centers (Owner) with Wharton Equity (Real Estate Developer) performs Market Analysis for a Data Center Expansion (CHS01) Phase 2. DETAILS: As Part of a 2 Phase, 128MW Data Center Building CHS01, Install the Remaining 112MW (First Phase 16MW) for the 128MW Data Center CHS01 Phase 2 (sqft unknown) plus Install Equipment and Supporting Systems in order to accelerate the delivery of next-generation infrastructure technology. REQUIRES: Building, Lighting, Plumbing, HVAC, Power Distribution Systems, Overhead Cable Trays, Fiber Optics, Diesel Generators, Uninterruptible Power Supply (UPS), Racks, Closed-Loop Liquid Cooling Systems, Water Supply System, Heat Exchangers, Server Room/Computer Equipment Room, Mechanical Equipment Room, Power Distribution Systems, Data Patch Panels, Telecommunications Cabling Systems, Information Technology (IT) Equipment, Temperature Controls, Fans, Switchgear, Transformers, Breakers, Back-Up Servers, Batteries, Fire Protection Systems, Storage Devices, Cables, Fire Suppression System, MCC plus Controls (PLC). ENVIRONMENTAL: (A) Ventilation and Exhaust Systems, Ducting, Fans.
Schedule LightHouse Data Centers with Wharton Equity continues with Market Analysis 3Q27 (Aug). LightHouse Data Centers with Wharton Equity selects (G/C) 3Q27 (Sep). (G/C) releases Equipment RFQs and Bid Documents plus Reviews and Selects Subcontractors 4Q27 (Oct) - 4Q28 (Oct). Construction is Tentatively Scheduled to Kick-Off 4Q27 (Nov). Estimated Project Completion 4Q28 (Nov).
Screenshot 2026-02-26 082725.jpg