Page 2 of 2 FirstFirst 12
Results 21 to 23 of 23

Thread: Bathroom Renovation Columbia

  1. #21
    Join Date
    Jan 2010
    Location
    Pawleys Island
    Posts
    36,213

    Default

    Quote Originally Posted by centurian View Post
    Maybe not, water damage, Bathrooms, kitchen, floor tile, laminate flooring, and landscaping. You gotta have a budget and council to protect the pocket book. You don't want your buddy doing it either. Anyway it works for me.
    I just had one that said they were on a budget, I consulted with them on everything and presented the options all the way through. He doubled the size of the deck, chose the most expensive composite decking line Timbertech made (their budget was for KDAT decking) went from a $25K deck to a $52K deck, hardwood over the LVT they originally chose, chose a downdraft and gas range that was $4k over the $4K budget I had for them, on and on. This didn't even take in the rot we uncovered, the encapsulation of the crawlspace, new front porch steps etc. They were adding things left and right, he got pissed at me, she got pissed at him, I got paid and they found a marriage counselor after being married for 40yrs. They hired a cheap guy to do the bathroom we uncovered rot in after I had designed it without telling me, called me last week to please come back and help them out, nope I'm done with that one. They ended up spending 2.5X what their budget was just with me. I see a lot of this be it new construction or renovations.
    Yeah, but do you consider a dog to be a filthy animal? I wouldn't go so far as to call a dog filthy but they're definitely dirty. But, a dog's got personality. Personality goes a long way.


    You might take out a dozen before they drag you from your home and skull fuck you to death. Marsh Chicken 6/21/2013

  2. #22
    Join Date
    Jun 2008
    Location
    Columbia
    Posts
    4,028

    Default Bathroom Renovation Columbia

    Quote Originally Posted by JABIII View Post
    I got to see a 30,000sqft build going on in Tryon the other day with a 6,000sqft guesthouse. How many motherfrickers do you even know that can't stay in a 30k foot house that you need 6k more to hold them all? Horse people are weird...
    About 1000 sq ft with good insulation and no cell service.

    And a couple hundred acres. Had to add that.


    Sent from my iPhone using Tapatalk
    Last edited by JOHNSON; Yesterday at 08:05 PM.

  3. #23
    Join Date
    Aug 2021
    Location
    NC
    Posts
    3,655

    Default

    Quote Originally Posted by Saltydog235 View Post
    I just had one that said they were on a budget, I consulted with them on everything and presented the options all the way through. He doubled the size of the deck, chose the most expensive composite decking line Timbertech made (their budget was for KDAT decking) went from a $25K deck to a $52K deck, hardwood over the LVT they originally chose, chose a downdraft and gas range that was $4k over the $4K budget I had for them, on and on. This didn't even take in the rot we uncovered, the encapsulation of the crawlspace, new front porch steps etc. They were adding things left and right, he got pissed at me, she got pissed at him, I got paid and they found a marriage counselor after being married for 40yrs. They hired a cheap guy to do the bathroom we uncovered rot in after I had designed it without telling me, called me last week to please come back and help them out, nope I'm done with that one. They ended up spending 2.5X what their budget was just with me. I see a lot of this be it new construction or renovations.
    When you start making changes to the project it really escalates the cost. I do budget quotes (which is not a firm price) and firm quotes every day from $200 to 5M. It is difficult to write in all the exclusions to the quote but I try. Signed change orders cut down on the amount of changes and the customer can see what the cost addition is all along. I dont deal with the general public but i can really see how it can get out of control. I do have to counsel the wife when she says why cant we do this instead i tell her it is going to double the cost.
    Last edited by centurian; Today at 07:13 AM.

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •