    Is this a gas turbine with solar or a combined cycle with solar?

    The only projects in Colleton county that I see are two Lithium batter projects...the plant itself and the expansion of said plant is already be planned and it looks like Boise Cascade is building a lumber warehouse and distribution center in Walterboro.

  2. #22
    Join Date
    Oct 2003
    Location
    Charleston
    Posts
    18,448

    Default

    Quote Originally Posted by drwilly View Post
    don't you care about global warming and your carbon footprint?
    I’d like to go on record here that I do not care.

  3. #23
    Join Date
    Nov 2007
    Location
    Newberry SC
    Posts
    3,538

    Default

    Quote Originally Posted by reeltight View Post
    Is this a gas turbine with solar or a combined cycle with solar?

    The only projects in Colleton county that I see are two Lithium batter projects...the plant itself and the expansion of said plant is already be planned and it looks like Boise Cascade is building a lumber warehouse and distribution center in Walterboro.
    Solar Turbines

  4. #24
    Join Date
    Dec 2009
    Location
    Darlington
    Posts
    3,978

    Default

    Quote Originally Posted by drwilly View Post
    don't you care about global warming and your carbon footprint?
    I’d be ok if I had Al Gores carbon footprint
    Tyler Simmons wasn’t offsides. 1-9-2018
    Isaiah Bond didn’t catch the ball. 12-2-2023

  5. #25
    Join Date
    Oct 2012
    Location
    Upstate, SC
    Posts
    805

    Default

    Quote Originally Posted by redhead25 View Post
    Everyone will posture and play the game, but at the end of the day, growth is exceeding the ability to supply electricity. No one….and I mean no one, is willing to go into rolling blackouts to fund the growth. Coal is not an option….nuclear is not an option…..gas is what is left. Dominion needs the reserves, Santee Cooper needs the reserves, and both have extremely old plants that are not fully reliable for long term solid options. Dominion knows that by tying Santee in with the deal, the permits and politics goes in their favor. This will have to happen.
    We need to put the "we're full " signs up
    Bluetick

  6. #26
    Join Date
    Nov 2007
    Location
    In the bend
    Posts
    5,632

    Default

    Quote Originally Posted by reeltight View Post
    Is this a gas turbine with solar or a combined cycle with solar?

    The only projects in Colleton county that I see are two Lithium batter projects...the plant itself and the expansion of said plant is already be planned and it looks like Boise Cascade is building a lumber warehouse and distribution center in Walterboro.
    Lithium plant or lithium recycle plant?

    Battery recycle plant is suppose to be coming to berk county in Camp Hall. It was suppose to break ground during Q4 of 2023.
    Last edited by b-stick; 02-24-2024 at 11:26 PM.

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •