Thread: Riverbank Remediation

  1. #1
    Join Date
    Nov 2005
    Location
    Fort Kickass
    Posts
    50,993

    Default Riverbank Remediation

    I sit on a high bluff. Non tidal. I lost a lot of trees in the river to Hurricane Matthew and my dirt has been steady falling in the river ever since.

    It's currently a hazard.

    I have pulled the edge off back (not pushed into the river) for a small grade but it's nowhere near where it needs to be to be safe, or keep from falling in.

    Is there a broad existing permit I can use to remediate my riverbank? I'd like to move fast on it and save some money. Otherwise, I'm tempted to dump a load of bricks and concrete down and start pushing dirt on top of it at night until I have a grade instead of an inverted cliff.

    I am about 30' high off the water.
    "Rivers and the inhabitants of the watery elements are for wise men to contemplate and for fools to pass by without consideration" -Izaak Walton

  2. #2
    Join Date
    Sep 2001
    Location
    Wateree, South Carolina
    Posts
    48,812

    Default

    My opinion is that you ain't winning that battle. I saw SCE&G try it with all of their resources. Interlocking concrete and everything. She was cutting behind that shit in a month...

  3. #3
    Join Date
    Jan 2007
    Location
    Blythewood, SC
    Posts
    2,613

    Default

    Rip rap what you can. It will slow it down but never stop it.

    Not trying to be a smart ass but you don’t have enough money to fight that war.

  4. #4
    Join Date
    Dec 2006
    Location
    Georgetown
    Posts
    2,959

    Default

    Quote Originally Posted by BigBrother View Post
    I sit on a high bluff. Non tidal. I lost a lot of trees in the river to Hurricane Matthew and my dirt has been steady falling in the river ever since.

    It's currently a hazard.

    I have pulled the edge off back (not pushed into the river) for a small grade but it's nowhere near where it needs to be to be safe, or keep from falling in.

    Is there a broad existing permit I can use to remediate my riverbank? I'd like to move fast on it and save some money. Otherwise, I'm tempted to dump a load of bricks and concrete down and start pushing dirt on top of it at night until I have a grade instead of an inverted cliff.

    I am about 30' high off the water.
    Not sure if you know him or not but I would consult with Craig over at WNWR and see what he says…after that I would call as many private consultants as I could. As a very very last result I would ask the Army Corp


    Sent from my iPhone using Tapatalk
    Conservation means the wise use of the earth and its resources for the lasting good of men. -Gifford Pinchot

    The beauty of the second amendment is that it will not be needed until they try to take it. -Thomas Jefferson


    The very existence of flame-throwers proves that some time, somewhere, someone said to themselves, You know, I want to set those people over there on fire, but I'm just not close enough to get the job done.

  5. #5
    Join Date
    Aug 2014
    Location
    Newington GA
    Posts
    4,858

    Default






    The mighty Savannah River, I placed and interweave 12by12by 16ft long concrete pillars 250 yard on a curve, then rip/ rap the base with slabs of concrete. Hauled in Clay then rocked the road. It hasn’t moved an inch in 3 years.

  6. #6
    Join Date
    Oct 2003
    Location
    Charleston
    Posts
    18,402

    Default

    I built a sea wall on a bluff like yours for my dad. It can be done.
    Last edited by Fish; 04-10-2023 at 05:38 PM.

  7. #7
    Join Date
    Oct 2019
    Posts
    821

    Default

    We always used rip rap years ago on the LPD but Tim Smith has it figured out. I'd do what he did if I could.

  8. #8
    Join Date
    Sep 2001
    Location
    Wateree, South Carolina
    Posts
    48,812

    Default

    Solid work right there TS...

  9. #9
    Join Date
    Aug 2014
    Location
    Newington GA
    Posts
    4,858

    Default

    You could stair step your bank being its only 30 ft to water. Pull all the fallen trees up and out the way. A 8-10 foot wide steps , then vegetate steps with trees, viney bushes native to area or lay black geo fabric and rip/ rap. Build a berm at top and divert water off fresh dirt till vegetation is established. FYI- rip/ rap is expensive, dirt is being hauled expensive,

  10. #10
    Join Date
    Jan 2003
    Location
    SC
    Posts
    24,411

    Default

    Zoshia grass grows thick on a 45 degree slope all the way to the water.


    I know a guy.

    Sent from my motorola edge plus 5G UW (2022) using Tapatalk

  11. #11
    Join Date
    Jan 2005
    Location
    FROG LEVEL
    Posts
    23,785

    Default

    Rock helps but rock done got expensive thanks to= well you know. Paid 970 delivered and dumped back in December for 21/tons. Hope you get it like you want it.
    Gettin old is for pussies! AND MY NEW TRUE people say like Capt. Tom >>>>>>>>>/
    "Wow, often imitated but never duplicated. No one can do it like the master. My hat is off to you DRDUCK!"

  12. #12
    Join Date
    Aug 2021
    Location
    NC
    Posts
    3,374

    Default

    I think there is a fabric you can lay before you put in the stone. It is supposed to let the water pass through but retain most of the soil instead of letting it wash out to the river. It doesn’t stop it but slows the wash down.

  13. #13
    Join Date
    Nov 2005
    Location
    Fort Kickass
    Posts
    50,993

    Default

    I’m on a long straightaway. Rain does more damage than the river does. Once I’m off the limestone shelf, it’s another 30’ drop to the bottom of the river. She runs deep and wide there.

    Ive got a buddy working a track hoe up the road from me right now. He doesn’t have anything on his dance card after that jobs done so I could get it done cheaper than it would be otherwise.

    I know Craig pretty well. I’ll reach out. Also talked to a few environmental engineers but it’s been a while and I’ve changed phones so those conversations have been lost. I think stepping would be ideal. Also riprap will never work because of the water depth there. Would like to get it done and make sure I’m not going to go to jail or fined into oblivion for fixing it.
    "Rivers and the inhabitants of the watery elements are for wise men to contemplate and for fools to pass by without consideration" -Izaak Walton

  14. #14
    Join Date
    Jul 2009
    Location
    Clarendon County
    Posts
    4,591

    Default

    Just keep fighting. Careful who you call….
    Last edited by santee11; 04-10-2023 at 08:46 PM.

  15. #15
    Join Date
    Sep 2008
    Location
    Carolinas
    Posts
    1,403

    Default

    USACE regulates below OHW. You can conduct certain activities without federal permitting but the scope is limited. Permitting isn't limited to the feds. You also have to consider state and local. Look into natural channel design techniques and methods to work with nature, instead of against it. I was with you when you tried to sneak too many shells past BD. Feel free to touch base and I'll share what I know.

  16. #16
    Join Date
    Jul 2016
    Posts
    326

    Default

    ACOE NWP 13 - Bank Stabilization no PCN required if < 500 LF of work & < 1 CY/ft fill.

  17. #17
    Join Date
    Nov 2005
    Location
    Fort Kickass
    Posts
    50,993

    Default

    Quote Originally Posted by BrandonWagner View Post
    ACOE NWP 13 - Bank Stabilization no PCN required if < 500 LF of work & < 1 CY/ft fill.
    Winner winner chicken dinner. I’m not filling. I’m removing. So no involvement with ACOE. It would be DHEC and or Georgetown county, right?

    Then I’d need somewhere to put all that dirt…so I’m renting a dump truck or two.
    "Rivers and the inhabitants of the watery elements are for wise men to contemplate and for fools to pass by without consideration" -Izaak Walton

  18. #18
    Join Date
    Dec 2013
    Location
    South Florida
    Posts
    2,423

    Default

    Prayers sent. Start with your local planning office before you are having to remediate your bank account too.
    "Hunt today to kill tomorrow." - Ron Jolly

  19. #19
    Join Date
    Aug 2014
    Location
    Newington GA
    Posts
    4,858

    Default

    Only one word you need to remember in every conversation : Maintaining. Don’t use repairing, new construction, etc.

  20. #20
    Join Date
    Nov 2004
    Posts
    49,826

    Default

    Are you using battery powered tools?