We are in the middle of our new construction and I’m already up to my eyeballs in stress over things I think have been half assed. A little run down, gave the contractor 10% up front to start, that was on May 4th. Nothing was even started until until June 4th when footings were dug. Foundation was done towards the end of August. Here it is almost the middle of October and the house is not dried in yet. The framers have been here 6 weeks. Subfloors have been rained on quite a few times and we now have mold/mildew in several places. One roll off of scraps was hauled off today and it was running over onto the ground and the one they brought today is 1/3 full. I feel like we are not getting a quality job and the framers have been excessively wasting materials. The contractor has only been out maybe 3 possibly 4 times during the last 6 weeks. Am I just too picky? Do I need to be concerned with stuff I see? This is my first build and I don’t know if these are usual things or if I have a legit reason to be quite fed up at this point. Take a look at some pics below and give me some feedback. Let me add, he assured me once he got started things would roll and I’ve yet to see anything “roll” except my $$.

6C4C1FC5-AF8E-43B0-932C-99F57999E2D7.jpg
BDBD09D1-5159-4085-A0C3-823987DC2F28.jpg
3E9039CE-CE15-42E6-8A9F-7F5AA454561B.jpg
DBDB66E9-89F9-4C73-B45C-163AA14CBE82.jpg
79488EA1-AF0E-43D5-A50A-A1591DF3D0A7.jpg
E39BE5C3-9BE2-4698-B224-86711EE65D25.jpg
EBDDE373-DB9F-4D1B-969B-F13348E4BA49.jpg
B6C0A249-3C1A-4A52-9B51-EAE0EAC363CF.jpg
F364D4F9-2DED-42C0-BC20-17F96F9D7F26.jpg
8962800F-9507-4E5B-A04C-3A7F0455F8F5.jpg