Looking for someone to build a 30 x 30 metal building with concrete pad. Any recommendations. Need outwards Mountville. Thanks fellas. Possibly looking towards June/July to get it done so not a big rush just gathering information and pricing.
Looking for someone to build a 30 x 30 metal building with concrete pad. Any recommendations. Need outwards Mountville. Thanks fellas. Possibly looking towards June/July to get it done so not a big rush just gathering information and pricing.
“Duck hunting gives a man a chance to see the loneliest places …blinds washed by a rolling surf, blue and gold autumn marshes, …a rice field in the rain, flooded pin-oak forests or any remote river delta. In duck hunting the scene is as important as the shooting.” ~ Erwin Bauer, The Duck Hunter’s Bible, 1965
“Duck hunting gives a man a chance to see the loneliest places …blinds washed by a rolling surf, blue and gold autumn marshes, …a rice field in the rain, flooded pin-oak forests or any remote river delta. In duck hunting the scene is as important as the shooting.” ~ Erwin Bauer, The Duck Hunter’s Bible, 1965
And take at least 6 months from signing.
I am looking at Luna Metal Buildings now out of Ashboro, NC. They do concrete pads and everything. My brother in law has one of their buildings and has no problems with it. Im looking at a 30x48. My BIL bought a 40x60.
Modular, red iron, pole barn style?
Steel frame? I got you an installer and a manufacturer. Call or text me. Andrew 704-616-4997
Steel frame definitely the way to go right now
"They are who we thought they were"
You can dress a fat chick up, but you cant fix stupid
Going to be a metal building for sure!
“Duck hunting gives a man a chance to see the loneliest places …blinds washed by a rolling surf, blue and gold autumn marshes, …a rice field in the rain, flooded pin-oak forests or any remote river delta. In duck hunting the scene is as important as the shooting.” ~ Erwin Bauer, The Duck Hunter’s Bible, 1965
Jacobs Carports out of Newberry. They are pretty good to work with and competitive on pricing.
I had a Eagle put up a couple months ago. 3 Mexicans did it. They showed up at 7am and I had coffee and snacks waiting. I fed them lunch and had drinks and water there for them all day. They finished up a little after dark. They went around with flashlights making sure they had all scraps up. They went around with silicone and sealed all the areas the trim and flashing came together. They even added some half sides to the 2 lean to sides I had put on at no charge. I couldn't be happier. It did take about 4-5 months after I signed the paperwork for them to get around to me.
I had the concrete poured by a local guy. Wish he had done as good of a job as the Mexicans.
I paid capital buildings a deposit back in October. They were just over $16k for a 30x40 with 2 12x40 lean to's. I had a buddy do the concrete. They originally told me 5-6 weeks and that if I poured my own concrete it would speed up the process. They have said "we will be there next week" for a solid month now. I'm about the most patient person in the world. My wife however isn't.
"They are who we thought they were"
You can dress a fat chick up, but you cant fix stupid
If you don't need it in a hurry then I would call capital. They are by far the cheapest. They have been a pain to deal with, or I should say diamond exteriors has been a pain to deal with. After you pay your deposit then you no longer deal with capital until final payment I would imagine. I am still waiting on mine to be put up. I'm sure the quality will be fine for what it is
"They are who we thought they were"
You can dress a fat chick up, but you cant fix stupid
Bookmarks