Guys, I have a small pool house that am cleaning up and plan to use it as an outside storage building. The pool was filled in years ago. The wood floor was absolutely shot so I pulled it all out and planned on putting another wood floor in but changed my mind and think I want to pour concrete in there.
What advice do you have? Do I need to pour it in 2 sections or will it be stable enough to do the entire floor in one day?
Bookmarks