Anybody know why they're doing all that clearing at their gate?
Anybody know why they're doing all that clearing at their gate?
Zeus Industries bought a chunk. Haven't heard what they'll manufacture at that site.
Bear problems
If a man is alone in the woods, says something, and a woman does not hear, is he still wrong?
Bipartisan usually means that a larger-than-usual deception is being carried out. —George Carlin
Common sense is not a gift. It's a punishment because you have to deal with everyone else who doesn't have it.
Turkeys were hot in there in early April
Them that don't know him won't like him, and them that do sometimes won't know how to take him
He ain't wrong, he's just different, and his pride won't let him do things to make you think he's right
They don't put Championship rings on smooth hands
Zeus Industrial Products Incorporated (Owner) with M. B. Kahn Construction Company Incorporated (General Contractor) performs Permitting for a Grassroot Plastic Tubing Manufacturing Plant. DETAILS: Construct (1) 148,000 sqft Building and Install Plastic Tubing Manufacturing Equipment & Systems to Manufacture Polymer Tubing for the Medical, Fluid Handling & Electric Markets. REQUIRES: Building, Equipment Pads, Tooling Production Equipment, Plastic Molding Machines, CNC Lathes, CNC Routers, Chillers, Cooling Tanks, Cutters, Dryers, Silos, Hoppers, Molds, Dies, Clamping Units, Slitting Equipment, Inspection Machine, Electrical Tie-Ins, Switchgear, Fire Suppression System, Packaging Equipment, Conveyors, Transformers, Testing & Inspection Equipment, Hydraulics, Pneumatics, Compressors (Air), Motors, Drives, MCC plus Controls (PLC), Explosion Proof Motors (VS). ENVIRONMENTAL: (A) Ventilation and Exhaust System, Ducting, Fans; (L) Containment, Drainage.
Schedule Zeus Industrial Products Incorporated with M. B. Kahn Construction Company Incorporation continues Permitting. Upon Permitting & funding Approvals, M. B. Kahn Construction Company Incorporation reviews and selects Subcontractors 2Q18 (May)-1Q19 as needed. Site-Preparation is Scheduled to Kick-Off 2Q18 (Jun). Planned Construction Kick-Off 3Q18 (Jul). Expected Project Completion 1Q19 (Mar).
Thanks Rhett.
Bookmarks