Not only are they gonna jack several bridges, but we're going to be doing a major paving job from MM 75-89. I did the plans for this segment, and in some places, we're cutting down as much as 1.0' to remove old pavement. I'm not sure when the paving is going to happen, but from what I remember from the staging plans, most lane closures are going to happen at night. Original plans were to cut down the crest vertical curves by several feet, but with all the rock in the area, it wasn't feasible for closures for blasting. (I'm pretty sure that was the main issue.)
Bridges affected:
- S-32 Jalapa Rd
- S-81 Old Whitmire
- SC-121
- S-44 Mt. Bethel Garmany
- S-82 Bachman Chapel
- S-38 Jolleystreet
- S-99 Old Jollystreet
- SC-773 St. Pauls
The bridges over Palmetto Trail will be rehabilitated during this project, too.