On our property we have a large creek and we are wanting to put in a crossing. I have already checked with the BMP forester for the upstate and we are good to put in any of the three types of crossings (bridge, pipe, or low water crossing). Does anyone have any recommendations for dozer operators/companies that can give us insight and quotes for the pipe or low water crossing options?

As for the bridge option, does anyone have any recommendations? It would need to be rated for about 6000lbs for tractor and implements. I found that company Allterrain Bridge but the most recent stuff I found was from 2015 and I cannot find any current contact/company information. Bridge would probably need to be at least 30 ft long to cover the span and have enough overlap. I have also looked at old semi flat beds as an option, anyone have experience with using that as a bridge?